EN
Desing
Desing
Вернуться назад
Installation
Installation
Вернуться назад
Maitanance
Maitanance
Вернуться назад
Assesment & audit
Assesment & audit
Вернуться назад
Industries
Industries
Вернуться назад
About us
About us
Вернуться назад
Learn more opportunities open for you contacting us from brief SOUZ Firesafety catalog
Смотреть Каталог
Заказать звонок
  • Home
  • \
  • About us
  • \
  • Portfolio
  • \
  • Akvilon Mitino: Installation of security systems and resource management systems

Akvilon Mitino: Installation of security and resource management systems in the residential complex

Request the call
Leave the request

Territory of work:
Moscow, Mitino district
Area of work:
1000 m²

The client:

The Akvilon Group of Companies – one of the Russia's leading developers.

 

Situation:

The comfort-class residential complex spans 13.5 hectares, requiring a large volume of modern engineering solutions that meet Russian environmental, fire safety, and sanitary standards, ensuring the safe operation of the facility. This involved implementing an IP-based security video surveillance system and automated resource consumption accounting systems (ASKUE).

 

Key Objectives:

  • Ensure the safety of residents through a scalable system:
    • 24/7 video surveillance with event recording throughout the entire property.
    • Control of entrance areas, children's and sports playgrounds, evacuation exits, elevator lobbies, and other public spaces.
    • Integration of the video surveillance system with fire alarms.
  • Automate dispatching and resource accounting in the residential complex, including leased areas:
    • Automated accounting of electricity, water, and heat consumption.
    • Data transfer for processing and analysis at automated workstations.
    • Transparent resource accounting system, eliminating human error.

 

Client Requirements:

  • Ensure all systems operate 24/7 with certified equipment.
  • Maximize protection of equipment from damage and unauthorized access.
  • Compliance with current regulations (SP), GOSTs, and Russian Federal Laws (FZ).
  • Installation of equipment considering ease of maintenance.
  • Quick integration with existing systems.

 

Solution:

In the first phase, we audited previous solutions and adapted them to the client's current requirements.

When designing the video surveillance system, we developed working documentation, including calculations for the number of cameras, placement, and viewing angles.

  • For external areas, Redline RL-IP55P-V-S.eco outdoor cameras were selected, and for internal spaces, RL-IP22P-S.eco vandal-resistant cameras were used.

The energy resource accounting system was designed based on:

  • Sanext Mono CU heat meters and their integration with automatic heat consumption regulation systems.
  • FEh and FEc water meters with RS-485 interfaces for data transmission.
  • "Pulsar" equipment (registers, software) for centralized reading of data.

Installation work was carried out within tight construction schedules and limited access to installation zones. This required detailed planning and working in shifts.

Cable routing with labeling and protection was done through steel pipes with fire-resistant foam at the points where walls and ceilings intersect. The installation of accounting cabinets (SHASKUVT, SHVTSS) was made in communication rooms, considering ease of maintenance.

 

Testing:

The commissioning and testing of cameras involved adjusting their positions for complete coverage of observation zones. The systems for heat, water, and electricity accounting were tested for compliance with passport parameters, integrating with software on automated workstations. Final tests were conducted to handle emergency situations in compliance with fire safety regulations.

 

Project Features:

  • Due to limited space under ceilings and in corridors, cable routing was adjusted to maintain minimum fire safety distances.
  • Some existing solutions were incompatible with the new equipment, which was addressed by developing custom software adaptations for the project.

 

Project Results:

Indicator Before Implementation After Implementation
Video Surveillance None 100% coverage of zones
Energy Resource Accounting Accuracy ±15% ±2%
Energy Efficiency - 7% reduction

 

Additional Benefits for the Client:

  • Reduced emergency maintenance costs due to a well-developed maintenance plan for engineering systems.
  • The ability to analyze data collected from the resource accounting systems allowed the client to implement additional measures to optimize resource consumption.
  • Tenants of commercial spaces gained access to a transparent energy resource accounting system, increasing trust and reducing the risk of disputes.
Message to WhatsApp
Request a callback
Subscribe to the newsletter
This website uses cookies to improve your user experience. View our Privacy Policy to learn more.
Accept
WhatsApp
Request a callback?